Create a responsive HTML website using the existing project stack for [PROJECT] and [AUDIENCE]. The task is: Service Status History.
## Required content and structure
Show service components, incident summaries, timestamps and resolution history.
Use [APPROVED_CONTENT] as the source of names, dates, figures, claims and destinations. List missing inputs before substituting anything. If a demonstration is needed, label its content as fictional. Do not invent customer quotes, rankings, partner logos or product capabilities.
## Design direction
Use [BRAND_RULES] and the design system already selected in the project. If no system is supplied, start with this direction: warm ivory, charcoal typography and one restrained acid-green accent; generous spacing and an asymmetric grid. Keep type, spacing and color roles consistent. Prioritize the task over decorative elements and avoid a generic collection of unrelated cards.
## Content preparation
Prepare service component names, incident timestamps, timezone and status definitions. Decide whether the page uses live data, a historical snapshot or explicitly labeled sample records.
## Layout and behavior
Separate current component status from the incident archive. Within each incident, show an ordered update timeline with affected services and the latest known resolution state.
## Task-specific acceptance check
- Distinguish operational status from historical records and label demo data.
- Try an ongoing incident, a resolved incident and a period without records.
- Make the last update time visible so a stale snapshot cannot be mistaken for current status.
## Implementation and review
Keep text editable. Use semantic structure, descriptive controls, visible keyboard focus and appropriate empty/error states. Check narrow and wide layouts. Respect reduced-motion preferences. Preserve any existing project framework and dependencies; do not silently replace the stack. Return the editable files and explain any incomplete behavior or unsupported inputs. Review this specific task before proposing extra features.
## Reference attachment and reconstruction goal
Attach reference.webp from this prompt’s download bundle alongside this prompt in OpenDesign. Build an editable result with a similar composition and hierarchy; do not embed the whole reference image as the finished interface. Preserve approved project content and brand rules if they conflict with fictional sample labels. If the image is missing or unreadable, ask for it instead of claiming visual fidelity.
## Reference composition and content
Use the attached reference.webp as the visual reference for Service Status History. Before building, identify the major regions from top to bottom, their relative widths and heights, alignment, spacing, typography hierarchy, surface colors, borders, imagery and repeated components. Preserve those relationships rather than substituting a generic template. Required task content: Show service components, incident summaries, timestamps and resolution history. Use the following task-specific layout guidance when translating the image into editable elements: Separate current component status from the incident archive. Within each incident, show an ordered update timeline with affected services and the latest known resolution state.
## Visual direction from the example brief
warm ivory, charcoal typography and one restrained acid-green accent; generous spacing and an asymmetric grid.
## Interaction specification
The reference is a static concept: the behavior below is a requirement to implement, not proof that the picture already works. Copy the customized prompt into your working project. Start with the core task: Show service components, incident summaries, timestamps and resolution history. Distinguish operational status from historical records and label demo data. For each visible control, specify its trigger, affected state and feedback; implement local changes with consistent state across related views. Give search and filters real results, selection controls an explicit active state, and save actions visible pending/success/failure feedback where relevant. Do not add unrelated workflows. Use proper links for navigation, buttons for actions and accessible names for icon controls. Do not imply a backend operation succeeded when only a local demo changed.
## Visual comparison and delivery
1. Compare the result with the attached image at matching proportions. Review major region placement, relative image sizes, line breaks, spacing, typography hierarchy, contrast, active states and content density before polishing decorative details.
2. Then test the narrow layout without squeezing desktop text into tiny labels.
3. Keep logos, photos and icons as separate assets and all meaningful labels editable. List any unavailable fonts/assets and any intentional departures. Return the working files plus a concise account of implemented behavior and remaining integrations; do not promise a pixel-identical result from the prompt alone.