Use the Prompt
Add Your Brief
Add your context below. It will be included with the prompt when you copy or download.
Create an interactive frontend prototype using the existing project stack and explicitly labeled demo data for [PROJECT] and [AUDIENCE]. The task is: Kanban Project Board.
Required content and structure
Organize work by status with owner, due date, labels and a task-detail panel.
Use [APPROVED_CONTENT] as the source of names, dates, figures, claims and destinations. List missing inputs before substituting anything. If a demonstration is needed, label its content as fictional. Do not invent customer quotes, rankings, partner logos or product capabilities.
Design direction
Use [BRAND_RULES] and the design system already selected in the project. If no system is supplied, start with this direction: light neutral canvas, graphite text, cobalt accent and precise hairline separators; dense but legible hierarchy. Keep type, spacing and color roles consistent. Prioritize the task over decorative elements and avoid a generic collection of unrelated cards.
Content preparation
Prepare columns, task statuses, owners, due dates and allowed transitions. Include blocked tasks and define what moving a card actually changes.
Layout and behavior
Make each card scannable through title, owner and relevant deadline. Provide a menu or keyboard path for movement so dragging is an option rather than a requirement.
Task-specific acceptance check
- Provide a keyboard alternative to dragging and show blocked work explicitly.
- Move a task with the keyboard, attempt an invalid transition and open a card with long text.
- Blocked work should remain visibly blocked after moving between columns.
Implementation and review
Keep text editable. Use semantic structure, descriptive controls, visible keyboard focus and appropriate empty/error states. Check narrow and wide layouts. Respect reduced-motion preferences. Preserve any existing project framework and dependencies; do not silently replace the stack. Return the editable files and explain any incomplete behavior or unsupported inputs. Review this specific task before proposing extra features.
Reference attachment and reconstruction goal
Attach reference.webp from this prompt’s download bundle alongside this prompt in OpenDesign. Build an editable result with a similar composition and hierarchy; do not embed the whole reference image as the finished interface. Preserve approved project content and brand rules if they conflict with fictional sample labels. If the image is missing or unreadable, ask for it instead of claiming visual fidelity.
Reference composition and content
Use the attached reference.webp as the visual reference for Kanban Project Board. Before building, identify the major regions from top to bottom, their relative widths and heights, alignment, spacing, typography hierarchy, surface colors, borders, imagery and repeated components. Preserve those relationships rather than substituting a generic template. Required task content: Organize work by status with owner, due date, labels and a task-detail panel. Use the following task-specific layout guidance when translating the image into editable elements: Make each card scannable through title, owner and relevant deadline. Provide a menu or keyboard path for movement so dragging is an option rather than a requirement.
Visual direction from the example brief
light neutral canvas, graphite text, cobalt accent and precise hairline separators; dense but legible hierarchy.
Interaction specification
The reference is a static concept: the behavior below is a requirement to implement, not proof that the picture already works. Copy the customized prompt into your working project. Start with the core task: Organize work by status with owner, due date, labels and a task-detail panel. Provide a keyboard alternative to dragging and show blocked work explicitly. For each visible control, specify its trigger, affected state and feedback; implement local changes with consistent state across related views. Give search and filters real results, selection controls an explicit active state, and save actions visible pending/success/failure feedback where relevant. Do not add unrelated workflows. Use proper links for navigation, buttons for actions and accessible names for icon controls. Do not imply a backend operation succeeded when only a local demo changed.
Visual comparison and delivery
- Compare the result with the attached image at matching proportions. Review major region placement, relative image sizes, line breaks, spacing, typography hierarchy, contrast, active states and content density before polishing decorative details.
- Then test the narrow layout without squeezing desktop text into tiny labels.
- Keep logos, photos and icons as separate assets and all meaningful labels editable. List any unavailable fonts/assets and any intentional departures. Return the working files plus a concise account of implemented behavior and remaining integrations; do not promise a pixel-identical result from the prompt alone.
Download Prompt + Image
Includes the complete prompt and full-size reference image. Attach both in OpenDesign to guide the layout.
How to Write a Kanban Project Board Design Prompt
Use this kanban project board design prompt to organize work by status with owner, due date, labels and a task-detail panel.
The reference is an AI-generated concept. The instructions below describe what to build and test; the image does not demonstrate working behavior.
Specify Moves as State Changes
A Kanban board is useful when moving a card means something clear.
Define allowed transitions and blocked work before describing the drag animation. Make each card scannable through title, owner and relevant deadline. Provide a menu or keyboard path for movement so dragging is an option rather than a requirement.
From the Prompt
Make each card scannable through title, owner and relevant deadline.
Make It Your Own
Use [STATUS_COLUMNS] with owner, due date and blocker labels on cards. Support both drag and a Move to control, announcing the destination and any rejected transition.
Prepare the Kanban Project Board Content
The board groups cards into To Do, In Progress, Blocked and Done with counts and metadata. Prepare the allowed statuses and task records before implementing movement.
Prepare columns, task statuses, owners, due dates and allowed transitions. Include blocked tasks and define what moving a card actually changes.
From the Prompt
Organize work by status with owner, due date, labels and a task-detail panel.
Make It Your Own
For [PROJECT], use [APPROVED_CONTENT] as the source for this kanban project board. Prepare columns, task statuses, owners, due dates and allowed transitions. Include blocked tasks and define what moving a card actually changes. Identify missing inputs before replacing them with demonstration content.
Move Without a Mouse
The side panel exposes the selected task’s details, subtasks and keyboard guidance. Test state synchronization and keyboard moves across columns; the screenshot does not prove drag-and-drop behavior.
Complete the same move by keyboard, then attempt a disallowed transition. Keep the card in its original state with a reason when the move cannot be applied. Move a task with the keyboard, attempt an invalid transition and open a card with long text. Blocked work should remain visibly blocked after moving between columns.
From the Prompt
Provide a keyboard alternative to dragging and show blocked work explicitly.
Make It Your Own
Review the kanban project board against this requirement: Provide a keyboard alternative to dragging and show blocked work explicitly. Move a task with the keyboard, attempt an invalid transition and open a card with long text. Blocked work should remain visibly blocked after moving between columns. Preserve approved content and revise only the parts that fail this check.
Review Your Kanban Project Board Result
A convincing screen is not a working backend. Test validation, permissions, persistence and failure behavior separately before connecting real data.
- Move a task with the keyboard, attempt an invalid transition and open a card with long text. Blocked work should remain visibly blocked after moving between columns.
Follow-Up Prompt
Use this after the first result. It narrows the revision to the most important part of this task.
Refine the current kanban project board. Move a task with the keyboard, attempt an invalid transition and open a card with long text. Blocked work should remain visibly blocked after moving between columns. Preserve the approved content and visual direction; change only the parts needed to resolve these issues.
